This was a planning of camp building for 2000 people, including supervisor accommodation for end user, design institute and factory premises, subcontract managers’ house, workers dormitory for contractor and other related facilities.

 

 

Project Name Iraq Sarah Harding 2 * 630 mw fuel power plant project
Client CMEC
Project Location Sarah Harding province
House Model ZA typeA4 typeZM type and light steel villa
Application Fields Construction camp
Type Sales
Building area 18000m2
Requirement 1.     This was a planning of camp building for 2000 people, including supervisor accommodation for end user, design institute and factory premises, subcontract managers’ house, workers dormitory for contractor and other related facilities.
2.     Short processing cycle (15 days) and installation time (6 months).
3.     Product features and configuration requirements (office, manager dormitory, worker dormitory, subcontractor dormitory and office, construction team dormitory and office, large-span restaurant, recreation hall and warehouse).
4.     Due to climate and environment requirements, it was required to resist strong sandstorm and wind, and the roof design was double reinforcement.
Project Details 1.     The contractor was China Machinery Engineering Corporation (referred to as "CMEC"), the subcontractor was China Machinery Industry Construction Group Inc. (referred to as "CMIC ")
2.     This was a new power plant which was to improve the local civil and industrial condition in using electricity.
3.     The project function was to set up power plant through fuel power and the buildings would last for 5 years.
Highlights 1.     It was comprehensive for camp design.
2.     The project was praised as "benchmarking camp construction project" by Iraq State Department of Power.
3.     ZA type achieved a breakthrough of reinforce except for the mounting roof.
4.     It was complicated that the technology and site emergency response plan were revised several times at the working site, and raw materials were changed as well.
5.     The roof of all camp buildings was red painted steel sheet which was high weather resistant, ensuring the color not to fade for 5years. The color steel sheet was thick and the doors and windows were higher in standard.
Benefits 1.     The delivery was on time and the quality was approved which made clients’ brand highly accepted and appraised by the end user in abroad. 
2.     Saving a lot of purchasing cost for client through the superiority of M steel products under the same span which expressed the cost performance deeply.
3.     The container loading volume of the patented products was small which saved a lot of transport cost for clients.