This project saved a lot of purchasing cost for client and cut down acceptance period that client promised to owner. With diversified and multi-functional product, standard construction and scientific project management, it became an excellent camp project.

 

Project Name Venezuela Central Power Plant Project
Customer CMEC
Project Location North-central of Venezuela in the Caribbean sea
House Model XSF, ZA, ZM, A4, K, light steel villa
Application Fields Camp application
Type EPC
Building Area 18000m2
Requirement 1.     This was a construction camp for 600 people and the life span was for 25 years, including supervisor accommodation for end user, design institute and factory premises, subcontract managers’ houses, workers dormitory for contractor and other related facilities (sewage treatment, wall guardrail, street lamps, sentry box, septic-tanks, outdoor cable and outdoor plumbing construction, infrastructure construction, etc.);
2.     Short processing cycle (30 days) and installation time (15 months).
3.     Product features and configuration requirements (office, manager accommodation, dormitory and the office for subcontractors and design institute, large-span restaurants, entertainment and warehouse).
4.     Due to climate and environment requirement and long lifespan (25 years), it required the strong structure corrosion resistance and wind resistance.
5.     Considering the requirement of cargoes collection and convenient installation at working site, the package and loading solution were both specialized.
Project Details 1.     Central power plant located in north-central Venezuela near the Caribbean sea which was currently the largest coal-fired power plants (fuel), nearly 30km from the largest port (POT. CABELLO) in Venezuela. The existing public facilities were complete and the expansion was available
2.     This power plant was one of the largest coal-fired power plants in Venezuela, which used to remold the original plant power level and improve the local civil and industrial electrical conditions.
3.     The project function is to set up power plant through fuel power and the total construction time limited within 5years.
Highlights  1.     The camp layout was comprehensiveinvolved widely in installation field and overall in service function.
2.     In the process of installation, it needed to be checked and accepted by the supervisor of European design institute, so the house acceptance criteria is extremely high and needed to provide a big volume of technical data.
3.     This project was appraised as "benchmarking camp construction project” by Venezuela's state power company.
4.     In this project, the light steel villa system has been widely applied and accepted. During the whole procedure, our people gained a lot of experience in design and installation. 
5.     It was complicated that the technology and site emergency response plan were revised several times at the working site, and raw materials were changed as well.
6.     We had sent the largest and most powerful construction management team and installation team to the working site. In rush hour the people could reach 74 nos.
Benefits 1.     The project of this power station was the first largest and most market-influenced project in South America. It embodied the international brand influence of client.
2.     This project was the first largest engineering camp project we participated. The features included the most comprehensive design, the biggest construction installation scope and the longest installation cycle, which had become a typical camp project case.
3.     We would be confident in delivering on time and fulfill quality and quantity as per requirements which made clients get high praise from the end users. 
4.     This project saved a lot of purchasing cost for client and cut down acceptance period that client promised to owner. With diversified and multi-functional product, standard construction and scientific project management, it became an excellent camp project.
5.     Unique design of patent product improved the container transport packing volume, which saved a lot of transportation cost for client.
6.     Although this project is still under progress, the periodical installation fully embodied our people’s high quality and technics, which won the customer’s high praise.
7.     The signing of this project would greatly enhance our market competitiveness in the field of light steel villa system and lay a foundation and strength of setting up a new villa company.