>
>
Sudan abramovich's osher Friendship Hospital Project
产品名称

Sudan abramovich's osher Friendship Hospital Project

没有此类产品
Description
Regional
Function
Fields
Camera
Area

This was the first project signed between CFPA and our company which led us to dedicate into the field of health care.

This project helped us accumulate valuable experience in design and installation in the line of hospital buildings

 

 

Project Name Sudan abramovich's osher Friendship Hospital Project
Client  China Foundation for Poverty Alleviation (CFPA)
Project Location Sudan
House Model LZA
Application Fields Hospital
Type Sales
Building area 1600m2
Requirement 1.     Due to the limited area, the design of the prefab hospital is special and irregular shape.
2.     Short processing cycle and installation time.
3.     Hospital room function and configuration (for maternal and child health, delivery room and infant room).
4.     The sealing is extremely high and the function must meet the basic requirement of hospital. Both indoor water and electricity materials are high standard for hospital.
Project Details 1.     In the end of May 2011, the demonstration project for system of maternal and child health care built by Sudan's first reconstruction hospital - Sudan and China abramovich's osher friendship hospital would have been completed. Sudan and China abramovich's osher hospital was located in the South, 140 kilometers far from Khartoum, which was the first rescue project. In the past nearly 40 years, the Chinese government had sent 29 batches medical team to work there, and the Chinese medical team established a deep feelings with the local people.
2.     After completion, the foundation would manage the hospital directly, introduce the advanced experience of the pregnancy safety project and build material and infant health care network surrounding the hospital, which will set up the demonstration hospital to improve the level of Sudan maternal and infant health care through the Chinese medical team. 
3.     The project is state aid project which will improve women and pregnant women health care level.
Highlights 1.    This was the first hospital construction project of our company.
2.    The project design was complex and it was supported and coordinated by Chinese Design Institute.
3.    The installation was difficult. There was technical change and adjustment in the process of installation and the corresponding housing frame and plate were adjusted at the working site.
4.    Flooring ceramic tiles were required to put on strictly and all indoor thresholds were barrier-free design, so it required accuracy for indoor base, floor laying and interior decoration. 
Benefits 1.     Our design changed the initial proposal of using local concrete building to save a lot of cost for clients.
2.     This project helped us accumulate valuable experience in design and installation in the line of hospital buildings
3.     This was the first project signed between CFPA and our company which led us to dedicate into the field of health care. 
Picture  

 

1
4:
2
5:
3
6:
暂未实现,敬请期待
暂未实现,敬请期待
Previous
Next