This was a planning of camp building for 1200 people, including supervisor accommodation for end user, design institute and factory premises, subcontract managers’ house, workers dormitory for contractor and other related facilities.

 

Project Name Sudan Fura 3 x135mw Electric Power Station Project
Client CMEC
Project Location 2 kilometers of the Fura town, Sudan
House Model ZA, A4, ZM, K.
Application Fields Construction camp
Type Sales
Building area 8000m2
Requirement 1.        This was a planning of camp building for 1200 people, including supervisor accommodation for end user, design institute and factory premises, subcontract managers’ house, workers dormitory for contractor and other related facilities.
2.        Limited time for manufacture (15 days) and installation (4 months).
3.        Product features and configuration requirements (office, manager dormitory, worker dormitory, subcontractor dormitory and office, construction team dormitory and office, large-span restaurant, recreation hall and warehouse).
4.        Due to climate and environment requirements, it was required to resist strong sandstorm and wind, and the roof design was double reinforcement.
5.        Trying to save quantity of containers in transportation.
Project Details 1.        The contractor was China Machinery Engineering Corporation (referred to as "CMEC"), the subcontractor was China Machinery Industry Construction Group Inc. (referred to as "CMIC ");
2.        This was a new power plant which was to improve the local civil and industrial condition in using electricity.
3.        Besides the standard product, we made some container amendment by decoration to meet the purpose. 
4.        The project function was to set up power plant through fuel power and the buildings would last for 5 years.
Highlights  1.        It was comprehensive for camp design.
2.        The project was praised as "benchmarking camp construction project" by Sudan end user. 
3.        ZA type achieved a breakthrough of reinforce except for the mounting roof.
4.        It was complicated that the technology and site emergency response plan were revised several times at the working site, and raw materials were changed as well.
Benefit  1.        The delivery was on time and the quality was approved which made clients’ brand highly accepted and appraised by the end user in abroad. 
4.        Due to climate and environment requirements, it was required to resist strong sandstorm and wind, and the roof design was double reinforcement.
3.        The container loading volume of the patented products was small which saved a lot of transport cost for clients.