The installation had been checked and accepted by local designing institute with Europe Standard.

Awarded as “Benchmarking construction camp”

Breakthrough in double reinforced roof system for ZA houses

Lots of technical revision at working site. We dealt with urgent treatment and components remaking.

 

 

Project Name

1st PHASE OF KOSTOLAC-B POWER STATION IN SERBIA

Client

CMEC

Project Location

Suburb of Kostolac city, 80km far from Belgrade, the capital of Serbia

House Model

ZA, ZM

Application Fields

Construction camp

Type

Sales + installation supervisor

Building area

4500m2

Requirement

1.      Workers quantity would be changed according to the project process and the peak was 600 people.

2.      Design with blueprint.

3.      Short-time processing(15days) and installation(6 months)

4.      Roof with double reinforced system due to the heavy wind and snow.

5.      Container quantity should be considered to save the transport cost.

Project Details

 

1.      The climate was rough with heavy wind and snow.

2.      The project was 1st phase of the power station which generated electricity by fuel to solve the local civil and industrial electrical conditions.

3.      Camp design with 600 people at the peak, including the houses and facilities for owner’s supervision, designing institute, suppliers, subcontractor management and construction workers.

4.      This project included office buildings, dormitories for management, workers, subcontractors & construction companies, large canteen, recreation, warehouse, etc.

Highlights

1.      Various facilities in the camp

2.      The installation had been checked and accepted by local designing institute with Europe Standard.

3.      Awarded as “Benchmarking construction camp”

4.      Breakthrough in double reinforced roof system for ZA houses.

5.      Lots of technical revision at working site. We dealt with urgent treatment and components remaking.

6.      The roof finishing of all the houses are baking coated color steel sheet which could not fade within 5 years.

7.      First construction camp in Europe.

Benefit

1.      The well accepted project showed CDPH high quality and technology and it played a part in getting the 2nd phase of this project.

2.      This project was for the first power station in scale and marking which indicated the influence of client’s international brand.

3.      Handed over the camp in time with high quality to ensure the client getting the praise from the owner.

4.      The right camp solution with cost performance had contributed a lot to client’s cost saving.

5.      Patented special design had improved the container loading to decrease the transportation cost.