Camp project in Tanzania
产品名称

Camp project in Tanzania

没有此类产品
Description
Regional
Function
Fields
Camera
Area

The highlights of the project:1. Reasonable camping layout.2. First lot’s delivery time was urgent, but after the production it was postponed by Tanzanian local political issues. After 2 months, it started again.3.Client was very satisfied with the supervision of our engineer on the job site

 

Project Name  Camp project in Tanzania
Client  China petroleum pipeline material and Equipment Corporation
Project Location  Tanzania
House Model  ZM,   A4-II
Application Fields  Industrial application ( construction camp/ mining camp)
Type  Sales+ installation supervisor
Building area  10297m2
Requirement  1.     Design as 7 different camps;
 2.     Need elevated flooring due to wet & humid condition;
 3.     Office/accommodation/canteen etc.
Project Details  1.     The end users were CPP No.1 Construction and No.6  Construction Company
 2.     This was the temporary camp for Petroleum Project.
 3.     The installation was arranged by client.
Highlights  1.     Reasonable camping layout.

 2.     First lot’s delivery time was urgent, but after the production it was postponed by Tanzanian local political issues. After 2 months, it started again.

 3.     Client was very satisfied with the supervision of our  engineer on the job site.
In summary   1.     Fast reaction for all the 7 camps.
 2.     To save cost for client, we offered the best options both on house cost and container loading, as well as installation. 
Photos  Please see attached photos.

 