Camp project in Tanzania
Description
Regional
Function
Fields
Camera
Area
The highlights of the project:1. Reasonable camping layout.2. First lot’s delivery time was urgent, but after the production it was postponed by Tanzanian local political issues. After 2 months, it started again.3.Client was very satisfied with the supervision of our engineer on the job site
Project Name | Camp project in Tanzania |
Client | China petroleum pipeline material and Equipment Corporation |
Project Location | Tanzania |
House Model | ZM, A4-II |
Application Fields | Industrial application ( construction camp/ mining camp) |
Type | Sales+ installation supervisor |
Building area | 10297m2 |
Requirement | 1. Design as 7 different camps; |
2. Need elevated flooring due to wet & humid condition; | |
3. Office/accommodation/canteen etc. | |
Project Details | 1. The end users were CPP No.1 Construction and No.6 Construction Company |
2. This was the temporary camp for Petroleum Project. | |
3. The installation was arranged by client. | |
Highlights | 1. Reasonable camping layout. |
2. First lot’s delivery time was urgent, but after the production it was postponed by Tanzanian local political issues. After 2 months, it started again. |
|
3. Client was very satisfied with the supervision of our engineer on the job site. | |
In summary | 1. Fast reaction for all the 7 camps. |
2. To save cost for client, we offered the best options both on house cost and container loading, as well as installation. | |
Photos | Please see attached photos. |