Nigeria Dairy Product Workshop Project
产品名称

Nigeria Dairy Product Workshop Project

没有此类产品
Description
Regional
Function
Fields
Camera
Area

The end user of this project was Hongkon Huachang Group, established by Mr. Li Wenlong. This group was very famous and owned totally 79 companies in China and African countries, especially in Nigeria there were 40 companies.

 

 

Project Name

Nigeria Dairy Product Workshop Project

Customer

Hong Kong Modern Construction Co.,Ltd.

Project Location

IKORUDO, Nigeria

House Model

ZM, H Steel, ZA, Modular House

Application Fields

Industrial

Type

EPC

Building area

20000m2

Requirement

1.CDPH could be responsible for designing, purchasing, manufacturing

   as well as site installation, in EPC model.

2.Short-time processing and installation(280 days);

3.Professional illumination system for workshop.

4.The products were required to work well in anti-corrosion.

5.The production and installation procedure should be supervised by the

   Third Party Inspection Organization.

Project Details

 

1.The end user of this project was Hongkon Huachang Group,

   established by Mr. Li Wenlong. This group was very famous and owned

   totally 79 companies in China and African countries, especially in

   Nigeria there were 40 companies.

2.This project was invested together by Hongkon Huachang Group and

   Ningbo Dairy Group, to be built for manufacturing diary beverage for

   improving catering standard in Nigeria.

3.This project used several types of our house models, including ZM light

   steel structure, ZA type, container house, and H type steel structure.

4.This project included workshop, office building, sewage treatment plan,

   boiler room and switch board room.

Benefit

1.Fulfilling the construction work at the same time as promised to

   customer. The quality and quantity were both checked and confirmed

   with high appraisal.

2.Using ZM building instead of H steel structure saved a lot of cost for

   customer.

3.Our patented products enabled the maximum and valuable container

   loading capacity, saving a lot of transportation expense for customer.

Highlights

Except for the foundation work, outdoor electrical and plumping system, our company had contracted the full job. We had dispatched working team to do the construction on site, using field management mode with the highlights as follows:

1.Design with ZM multi-span connection.

2.Interior and exterior decoration for H type two storey building.

3.Making solution for the connection between ZM and H steel structure.

4.Raw materials adjustment for many times and a lot of technical revision

   at the working site due to the complicated working conditions.