>
>
The Coal fired power Station project in Tar, Pakistan
产品名称

The Coal fired power Station project in Tar, Pakistan

没有此类产品
Description
Regional
Function
Fields
Camera
Area

 

 

Project location: Pakistan
Camp construction: Beijing Chengdong International Modular Housing Corporation
Project features: tight construction period, heavy task, resistance to sand and wind attack
Barracks Area: 18,383 square metres

 

 

 

Solution

 

1. Advantages of structural system and section

 

      ZA outlets steel structure system, by cold-formed thin-walled C steel bolt connection back-to-back, cold-formed thin-walled steel is a kind of reasonable section shape, good mechanical performance, high utilization rate of steel, economy, environmental protection building materials, compared with the hot rolled steel, its property of good cross section under the condition of same area, radius of gyration cold-formed thin-wall steel 50% ~ 60% larger than hot rolled section steel, cross section moment of inertia increases 1.5 ~ 4 times.Compared with the traditional steel structure, the dead weight of the building is lighter, the bearing capacity of the foundation is reduced accordingly, and the earthquake action is less. The cold-formed thin-walled steel can improve its strength due to the cold-formed effect after cold-working

 

 

 

 

2. Advantages of corrosion protection
 
 
           Beam, column, purlin and other structures are hot-dip galvanized, with superior anticorrosion performance. Standard accessories are used for full-bolt connection without welding, which reduces the deformation and stress concentration caused by welding.
 
 
 

 

 

3. Advantages in transportation and construction
 
 
       Main profile can be packaged transport, cold bending C payments more than transport volume of hot-rolled tube shipping volume is small, compared with the truss beam is greatly reduced the transportation volume, construction, structure compared to much light truss beam, the construction more convenient than truss, affected by the climate small, component USES the factory prefabrication, field assembly construction.No wet operation, noise, dust and less construction waste.
 
 

 

 

4.Accommodation
 
        Accommodation part adopts LZA, for outlets steel frame structure, structural system due to span is small, after calculation, beams and columns of main structure adopt square tube section, using cold-formed thin-walled C steel purlin order structure, the illustrated the gallas pole compared with traditional truss beam, the structure can packaging transportation, reduce transportation volume, construction and traditional truss beam ratio, faster and more convenient, structure USES the factory prefabrication, field assembly all bolt connection, short construction period, no noise, less dust and construction waste.
 

 

Building Process

 

 

building process

 

 

 

Roof installation

 

 

 

Office completion effect

 

 

Camp Completion effect

 

 

 

 

 

 

 

 

 

 

 

1
4:
2
5:
3
6:
暂未实现,敬请期待
暂未实现,敬请期待
Previous
Next