Tanzania Gas Pipeline Camp Project
产品名称

Tanzania Gas Pipeline Camp Project

没有此类产品
Description
Regional
Function
Fields
Camera
Area

 

 

Project location: From Mtwara to Dar es Salaam
Camp construction: Beijing Chengdong International Modular Housing Corporation
Project features: aerial ground, moistureproof, anticorrosive, fire prevention
Camp area: 10,298 square meters

 

 

 

 

 

Solution

 

 

One, moistureproof anticorrosion
 
1. The house adopts the whole galvanized detachable overhead floor with a height of 300mm, which makes the bottom ventilated smoothly and avoids the damp ground, thus ensuring the dry living environment in the room.
2. The structure of the house is made of hot-dip galvanized steel. The hot-dip galvanized profiles have stable quality and the surface layer is not easy to fall off, which has very good anti-corrosion performance and is suitable for the environment with high humidity.
 

 

Detachable overhead ground

 

 

Second, the kitchen fire prevention
 
      The maintenance material of the colored steel house used in the project is polystyrene composite board, which has poor fireproof performance and the kitchen has open fire. Finally, the functional room adopts the form of light steel keel, glass silk foam insulation and calcium silicate board on the surface of the original wall material to solve the fire prevention problem in the kitchen. 
 

galvanized steel strip

 

Third, the concrete construction is difficult
 
1. Site foundation construction conditions are poor, and there is no large amount of concrete pouring. Type A houses selected in this project are light in weight and have low foundation requirements.
2. The building ground adopts overhead ground, so there is no need to rebuild the ground on site, which greatly reduces the amount of concrete construction.
 

 

 

Site

 

 

 

Building Process

 

 

 

 

 

Installation procedure

 

 

 

Completion of the Effect

 