>
>
The Ethiopian National Railway Light Rail Camp Project
产品名称

The Ethiopian National Railway Light Rail Camp Project

没有此类产品
Description
Regional
Function
Fields
Camera
Area

 

 

Project location: Ethiopia
Camp construction: Beijing Chengdong International Modular Housing Corporation
Project features: production, processing and convenient installation
Campsite area: 37758 square meters
 

 

 

Solution

 

 

I. Quick supply
 
     Standing stock: The Type A house selected for this project is the standardized product of Chengdong camp. Standing stock is available for emergency delivery.
Short production cycle: mechanical production of structural components - no welding, hot dip galvanized strip - no painting can greatly save processing cycle.
 
Ii. Quick installation
 
     Quick installation: 95% of the work of type A house has been completed in the factory, and the site can be moved in simply by assembling, which is very suitable for the tight schedule of this project.
     Easy to install: The local power supply of this project is extremely abnormal, the power network is not perfect, except for the towns along the line, the rest of the area electricity is scarce.Most sections of construction and life need to use spontaneous electricity, and the structural components of type A house are special closed cavity component integrated design, good strength, light weight, simple tools, the house installation does not need to use power, crane, can be quickly completed in the construction conditions are not perfect in the area.
 
 

appearance of type A

 

 

Iii.The functions of office buildings are concentrated
 
     Office building: the office building is designed to be on the second floor, with two running stairs placed inside. It has a handsome appearance, flexible interior layout, concentrated functions, and small radius of activity, which is convenient for working communication.
 
 

appearance

 

 

 

Building process

 

 

structural installation of office building

 

 

 

Installation of wall and roof panel 

 

 

 

Completion effect

 

 

 

 

1
4:
2
5:
3
6:
暂未实现,敬请期待
暂未实现,敬请期待
Previous
Next