Beijing Subway Line 8 qianmen Project
产品名称

Beijing Subway Line 8 qianmen Project

没有此类产品
Description
Regional
Function
Fields
Camera
Area

 

 

Project location: Next to The Qianmen Gate Tower in Beijing
Camp construction: Beijing Chengdong International Modular Housing Corporation
Features of the project: high requirements on corporate image, internal corridors, fire prevention and other regulations, and the appearance of the camp should be coordinated with the surrounding environment.
Campsite area: about 3500 square meters

 

 

 

 

 

Solution

 

 

I. Appearance effect of the camp
 
      The site of the camp is a long and narrow plot, the most inside is a U-shaped three-storey office building, adjacent to a three-storey dormitory building, and the main entrance of the camp is the underground excavation of the metro area.The exterior color of the house adopts gray to make the overall exterior color close to the surrounding ancient buildings and the surrounding environment.At the same time, the gray corrugated plate is used in the wall panel, which is similar to that in the whole enclosed work area, making the whole project uniform in appearance.

 

 

Ii, the structure layout of the house
 
     It adopts the design of three-storey house with built-in corridor. Meanwhile, the meeting room on the first floor is increased by 1M to increase the height. Due to the large span of the meeting room, H steel profile is locally added for reinforcement.Meet customers as the headquarters reception of various inspection meetings used.
 
 

 

Iii, fire prevention treatment
 
        The panel of the building structure is made of glass silk floss to meet the requirements of the building. The floor is reinforced by the structure, and the floor is paved with concrete tiles to meet the requirements of fire prevention.
 

 

 

Iv. Safe and civilized construction
 
       The project is close to Qianmen Gate Tower and Tian 'anmen Square, which is not only the commercial tourism, but also the political center of Our country. The frequency of inspection and the requirements of the owner are very high. The company has completed the project successfully after careful installation plan and excellent site managers were dispatched to cooperate with the owner.
 

 

 

 