>
>
The Dangote Refinery project in Nigeria
产品名称

The Dangote Refinery project in Nigeria

没有此类产品
Description
Regional
Function
Fields
Camera
Area

 

Project location: Lagos, Nigeria Free Trade Zone
Camp construction: Beijing Chengdong International Modular Housing Corporation
Features of the project: wind resistance, corrosion resistance, fire resistance, durability
Campsite area: 162,900 square meters
 
 

 

 

 
Room selection and Solutions

 

 

     The room selection is more comprehensive, anti-corrosion, wind resistance, sealing, fire, safe installation convenient and so on put forward very high standard.
All accommodation types of this project are LZA rooms, with indoor corridors and complete supporting facilities. Distribution boxes are also provided by our company. The circuit is prefabricated in the factory in advance, making installation convenient.
 
     The office USES my company's independent research and development of the framework system of the new ZA room, complete, reliable structure, climate durability, structure hot galvanized anticorrosive treatment, good corrosion resistance, can adapt to a variety of climatic conditions such as Marine climate, tropical rain forest climate.Seal, the structure frame is placed inside the wall roof, the wall roof seamless splicing, sealing performance is good.Bolted connection of standard parts, no painting, no pollution, no welding on site, avoid excessive use of manual and mechanical equipment.
 
     The office of the site adopts the XSF room of our unit, which has good wind resistance, convenient transportation within the site and can be transported as a whole without disassembly, excellent heat insulation, heat preservation, moisture resistance and corrosion resistance.
 
 
 

Building process

 

 

 

 

Completion effect

 

 

 

 

staff canteen

 

 

 

staff  dormitory

 

 

the dormitory corridor

 

 

 

staff washing area

 

 

Overall effect of camp 

 

 

      It took us 170 days to complete the required goods of 162,900 square meters (927 containers) (raw material procurement, production and processing, collection of supporting goods, and factory shipment) of this project.The site has completed the installation of more than 11,000 square meters has been delivered to the customer for use, and has been well received by customers.

1
4:
2
5:
3
6:
暂未实现,敬请期待
暂未实现,敬请期待
Previous
Next