Nigeria Dangote Refinery Phase II 10,000 person Camp Project
Description
Regional
Function
Fields
Camera
Area
Cmap Introduction
Selection of house type and scheme
The house type of this project is mainly the accommodation camp, which puts forward high standards for corrosion resistance, wind resistance, sealing, fire prevention, safety, convenient installation and so on.
All accommodation types of the project are LZA rooms, with indoor corridors and complete supporting facilities. Distribution boxes are also provided by our company. The circuit is prefabricated in the factory in advance, making installation convenient.
The hospital adopts the independent research and development framework system of the new ZA room, complete supporting, reliable structure, climate durability, structure hot galvanized anticorrosion treatment, good corrosion resistance, can adapt to a variety of climatic conditions such as Marine climate, tropical rain forest climate.Seal, the structure frame is placed inside the wall roof, the wall roof seamless splicing, sealing performance is good.Bolted connection of standard parts, no painting, no pollution, no welding on site, avoid excessive use of manual and mechanical equipment.
Camp Show
aerial view of part of the camp
Site construction photos
Site construction photos
staff dormitory
staff washing area and toilet
Busy staff in the restaurant
The project took 120 days to complete (raw material procurement, production and processing, collection of supporting goods, and factory shipment) the required goods of more than 70,000 square meters (395 40-foot containers).The houses that have been put into use on site have been highly praised by customers.It also lays a more solid foundation for the further cooperation between Chengdong and The richest man in Africa!