You need camp containers for your worksite, mining operation, or oil field, but you don't know which ones keep workers safe during storms. This article shows you what three weld points to inspect, why they prevent collapse in heavy rain and landslides, and how to check them in 5 minutes before you sign the purchase order.
Camp containers face extreme loads during storms. Water adds 1,000 kg per cubic meter. Mudslides push sideways with forces over 5 tons per square meter. Three weld locations carry these loads:
Corner casting to main rail welds – These four corners hold the entire container weight during lifting and when stacked. Each weld supports 30 tons minimum in certified containers.
Roof purlin to side rail connection welds – These welds stop the roof from folding inward under water weight. A 40-foot container roof collects 8 tons of water in a 200mm rainstorm.
Floor cross-member to bottom rail welds – These welds keep the floor from punching through and maintain the box structure that resists twisting during ground movement.
Weak welds in these spots cause 90% of container failures during extreme weather events.
Corner casting welds crack when containers sit uneven on soft ground. The weight shifts to one corner. Rain soaks the ground. The container tilts. The weld tears. The stack collapses. This happens in 73% of multi-container failures during monsoon season.
Roof purlin welds snap when water pools instead of draining. Each purlin weld holds 500 kg in normal conditions. Water pooling doubles this load. Rusted welds lose 60% of their strength. The roof folds. Workers inside get trapped.
Floor cross-member welds break when mud pushes sideways against the container walls. The floor is the only thing keeping the walls from spreading apart. Broken welds let the walls bow outward. The door frame twists. You cannot open the emergency exit.
Bring a flashlight and a small hammer. Check these three spots:
Corner casting welds: Look for cracks where the casting meets the rail. Tap with the hammer. A clear "ping" means good weld. A dull "thud" means hidden crack. Reject containers with any visible rust streaks coming from the weld. These streaks prove water is already inside the crack.
Roof purlin welds: Open the door. Look up at the ceiling corners. The welds should look like smooth metal ribbons, not bumpy or cracked. Use your phone flashlight. Any weld that looks like it was painted over with thick paint is hiding a repair. Ask for the repair certificate. No certificate? Walk away.
Floor cross-member welds: Lift the floor mat in one corner. Look where the floor meets the wall. The welds should be continuous, not spotty. Gently pry with a screwdriver. Good welds don't move. If the metal flexes, the weld is only holding on one side.
| Parameter | Minimum Standard | Why It Matters |
| Corner weld penetration | 6mm full penetration | Prevents tear-out during ground shift |
| Roof load capacity | 300 kg/m² | Handles 300mm rain + debris |
| Wall thickness | 3mm Corten steel | Resists mudslide impact |
| Floor weld spacing | Every 300mm continuous | Distributes ground pressure |
| Stack height rating | 9-high certified | Proves corner weld strength |
For jungle sites with heavy rain: Pick containers with roof purlin welds inspected by ultrasonic testing. Water pools fast under tree debris. You need roof load capacity of 400 kg/m² minimum.
For mountain sites with landslide risk: Demand corner casting welds with X-ray certificates. The ground moves in seconds. Your container must hold its shape when tilted 15 degrees.
For coastal sites with salt air: Insist on floor cross-member welds ground smooth and coated with epoxy. Salt spray eats welds from the inside. Inspect these welds every 3 months.
For desert sites with flash floods: Choose containers with extra floor welds every 150mm. Sand turns to concrete in flash floods. The floor needs double support.
Grade the ground with a 2-degree slope away from container doors. This stops water pooling. Cost: $50 in labor. Benefit: Prevents 8 tons of water load.
Place concrete blocks under each corner casting, not just wood. Wood sinks in rain. Concrete stays level. Each block costs $20. A collapsed container costs $50,000 in damage and injuries.
Stack containers with corner casting locks only. Never weld stacks together. Welded stacks transfer stress. When one corner fails, they all fail. Locks let each container move independently.
Keep 1-meter clearance between container rows. This gives mud a path to flow past instead of pushing against walls. It also lets you inspect side welds monthly.
Every Monday: Walk around each container. Look for new rust streaks from corner welds. Takes 2 minutes per container.
First day of each month: Tap roof purlin welds with a hammer while inside. Listen for sound changes. Mark welds with paint pen. Date the mark.
Every 3 months: Jack up one corner 5cm. Look under the container. Check floor cross-member welds for cracks. Use your phone to photograph each weld. Compare photos. New cracks show as dark lines.
After every storm: Inspect all three weld points immediately. Water hides in cracks. When it freezes, it expands. A 1mm crack becomes 3mm overnight.
Record everything in a logbook. Write the container number, date, and what you found. This log proves you inspected. It protects you from liability if failure happens.
A standard container costs $3,500. A storm-certified container with documented weld inspections costs $4,200. The $700 difference buys you:
X-ray inspection of all three critical weld points
6mm full-penetration welds instead of 3mm surface welds
A certificate showing each weld point's load rating
One worker injury from container collapse costs $150,000 in medical and downtime. The math is simple. Spend $700 now or $150,000 later.
Seller cannot show weld inspection certificates
Welds painted with thick, fresh paint (hiding repairs)
Container more than 15 years old with no weld maintenance records
Price more than 20% below market average (corners were cut, literally)
Roof has dents deeper than 2cm (purlin welds already stressed)
You now know the three weld points that keep workers alive during storms. You have a 5-minute inspection method. You understand why each weld matters. Use this information when you talk to suppliers. Ask for weld certificates first, then price. The container that saves money today can cost lives tomorrow. Choose welds over discounts.
Scan the QR code to follow