Blog
Release date:Jul 24, 2025
Share:
Flat pack container houses have revolutionized modern construction by blending industrial efficiency with residential comfort. At Chengdong Modular House, we’re demystifying the costs behind these innovative structures so you can make informed decisions for homes, offices, or community projects.
Speed & Simplicity:
Assemble a 200 m² villa in 15–30 days – 70% faster than traditional builds.
Modular units ship pre-fitted with electrical/plumbing systems, cutting on-site labor by 60%.
Eco-Conscious Design:
Made from recycled steel and insulated panels, reducing waste by up to 90% .
Long lifespan (20–30+ years) with corrosion-resistant materials.
Limitless Flexibility:
Stack units vertically (up to 3 floors) or connect horizontally for villas, schools, or clinics .
Key factors influencing pricing (based on 2025 market data):
Type | Size (m²) | Price Range | Ideal Use Case |
Basic Single Unit | 18–22 | $2,000–$2,600 | Backyard office/studio |
Luxury Expandable | 30–40 | $6,000–$10,000+ | Family home/villa |
Custom Multi-Module | 100+ | $25,000–$50,000+ | Apartment blocks/schools |
Example: A 225 ft² Canadian backyard unit cost $13,000 fully installed (including permits and utilities) .
Economy: Galvanized steel + EPS foam insulation ($0.87–$2.60/m²) .
Premium: Fireproof rock wool panels, hardwood flooring, and smart-home systems (+15–30% cost) .
Solar panels, rainwater systems, or rooftop terraces: +$1,500–$5,000.
Interior finishes (minimalist to luxury): +$3,000–$20,000.
Entry-Level: Shandong-based units start at ¥6,500/unit ($900) for basic 18 m² worker housing.
Mid-Range: Jiangsu’s 40 ft expandable homes with thermal insulation: $1,880–$2,078/unit (10+ order discount) .
High-End: Fully customized 200 m² smart villa with installation: ~$50,000.
Permitting & Installation: Budget 15–20% extra for site prep, crane rental, and utility hookups.
Long-Term ROI: Energy-efficient designs cut utility bills by 40%, and units retain resale value.
Financing: Chengdong offers lease-to-own plans with 10% upfront (inquire for regional programs).
Guangzhou’s CMC module project built a 3,300 m² eco-friendly kindergarten in 60 days using 57 prefab units. Cost savings: 30% vs. conventional methods .
Direct Factory Pricing: No middlemen = 15% lower costs than competitors.
5-Step Support: Design → Permitting → Shipping → Assembly → After-sales.
Global Compliance: Meet US, EU, and AU building codes (ISO10012 certified).
Q: Can I install a container home myself?
A: Yes! Our bolt-together designs require basic tools. Optional on-site crews available.
Q: What’s the delivery time to Europe/US?
A: 20–25 days production + 30–35 days shipping 13.
Q: Are financing options available?
A: We offer flexible payment plans – 50% deposit, 50% upon delivery.
Scan the QR code to follow