Area:
Asia
Room Type:
Prefab House
Field:
Military
Area:
1000-4000㎡
Scenes:
Temporary Accommodation Office
Time:
2024year
Project Features:
1. The construction period is 1 month
2. Increase decoration on the façade of the house according to customer needs to improve the aesthetics
3. The second floor is equipped with a single-slope roof to facilitate drainage in the rainy season
4. Use graphene floor heating equipment in winter
Back to list
Scan the QR code to follow