Area:
Asia
Room Type:
Modular House
Field:
Engineering Camps
Area:
1000-4000㎡
Scenes:
Office Space Temporary Accommodation
Time:
2024year
Project Features:
1.Standard modular box room project camp scene office building
2. The conference room adopts lengthened and heightened modules to improve the comfort of use
3. The indoor stairwell uses double-run staircase design to increase traffic efficiency
4. The corridor facade is decorated with glass curtain wall to improve the overall aesthetics and highlight the corporate image
Back to list
Scan the QR code to follow