Tel / Whatsapp:+86 18001125785

Email:chengdong@cdph.com.cn

INQUIRY→
Shanshan, Xinjiang 1GW Wind Power Project Department Camp Project

Shanshan, Xinjiang 1GW Wind Power Project Department Camp Project

Home/

Case Center/

Shanshan, Xinjiang 1GW Wind Power Project Department Camp Project/

Shanshan, Xinjiang 1GW Wind Power Project Department Camp Project

Shanshan, Xinjiang 1GW Wind Power Project Department Camp Project
Shanshan, Xinjiang 1GW Wind Power Project Department Camp Project
Shanshan, Xinjiang 1GW Wind Power Project Department Camp Project
Shanshan, Xinjiang 1GW Wind Power Project Department Camp Project
Shanshan, Xinjiang 1GW Wind Power Project Department Camp Project
Shanshan, Xinjiang 1GW Wind Power Project Department Camp Project
Shanshan, Xinjiang 1GW Wind Power Project Department Camp Project

Project Overview

Area:

Asia / China

Room Type:

Modular House

Field:

Engineering Camps

Area:

1000-4000㎡

Scenes:

Accommodation Office Restaurant

Time:

2026year

Project Features:

1.Located in the eastern section of the Turpan Basin, Xinjiang, the project site experiences gales of Force 8 or above for over 160 days a year, with instantaneous wind speeds reaching Force 14. This poses stringent requirements for the wind-resistant structural integrity of the buildings

2.The project utilizes Chengdong's independently developed Gobi Box cabins, featuring optimized roof and wall panel designs. Tailored to the severe sandstorm environment, the entire cabin incorporates upgraded multi-layer sealing technology to effectively block sand and dust intrusion, ensuring a clean and comfortable interior environment.

3.Furthermore, the snow load capacity and wind-resistance ratings have been significantly enhanced to effortlessly withstand extreme weather impacts such as Gobi blizzards and violent storms, thereby establishing a solid safety baseline for the structures.

Get a quote

whatsapp.png
+86 18001125785
zongubimgfz3.svg
chengdong@cdph.com.cn

Scan the QR code to follow